Well we have now installed our first Treatment plant of the year, found a new supplier and happy with the service.This was installed in a very sandy area with a high water table.
The plant went in without any problems.The discharge was to a ditch, we had to dig this out so the digger worked overtime.Photos of this plant will be posted on our new site once it has been developed by our webmaster.
The site will be http://www.sewage-treatment-plant.co.uk this will be linked to our main site http://www.drain-repair-hampshire.co.uk
Please feel free to visit.
Have already carried out several site surveys and put the quotes in for more plants. My target is 25 tanks this year. All tanks come with Insurance backed guarantees of 5 years and 25 year manufactors gurantees on the tank, pumps and switches are 2 years.
0800-0978-130
Wednesday, January 16, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment